EPIC for Gas Supply to Facility D
at Al Wakrah Phase 1

The scope of work includes Design, Detailed Engineering, Procurement, Installation, Commissioning of approximately 7 KM of 30” gas pipeline from TIE-IN point at 24th km of 30” existing pipeline from Station S to new Station W5 near to the proposed power station Facility -D at Wakrah.

The scope also includes the provision of vessels, filters, DG sets and HVAC system etc.

The site work is green field work